Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to the newest version of your browser.

Your browser appears to have cookies disabled. For the best experience of Construction News, please enable cookies in your browser.

Welcome to the Construction News site. As we have relaunched, you will have to sign in once now and agree for us to use cookies, so you won't need to log in each time you visit our site.
Learn more

HS2 contracts: Full breakdown of all awards so far

High Speed 2 has unveiled the winners of the seven phase one civils packages worth a total of £6.6bn.

These are the second major construction packages to be awarded after consortiums were picked back in November for the three enabling works contracts worth £900m.

Construction News has put together a full breakdown of all of the awarded contracts and shortlists so far, plus all the future opportunities coming up.

LIVE CONTRACTS
ContractStatus Award dateBidders/winnersValue
Engineering delivery partner  Awarded Mar 16 CH2M / Atkins / Sener £350m
Enabling works (South) ITT closed - Evaluation Nov 2016 Costain / Skanska JV £300m
Enabling works (North) ITT closed - Evaluation Nov 2016 LM – Laing O’Rourke / Murphy £300m
Enabling Works (Central) ITT closed - Evaluation Nov 2016 Fusion – Morgan Sindall / Bam / Ferrovial  £300m
Civils: Euston Tunnels and approaches ITT Live Jul 2017 CEK JV – Carillion / Eiffage / Kier; Fusion JV – Morgan Sindall / Bam Nuttall / Ferrovial Agroman; Momentum Infrastructure – Dragados / Hochtief / Galliford Try; SCS JV – Skanska / Costain / Strabag £600m-£900m
Civils: Northolt Tunnels ITT Live Jul 2017 Align JV – Bouygues TP/ VolkerFitzpatrick / Sir Robert McAlpine; CEK JV – Carillion / Eiffage / Kier; Fusion JV – Morgan Sindall / Bam Nuttall / Ferrovial Agroman; SCS JV – Skanska / Costain / Strabag £800m-£1.45bn
Civils: Chiltern tunnels and Colne Valley  ITT Live Jul 2017 Align JV – Bouygues TP / VolkerFitzpatrick / Sir Robert McAlpine; BBV JV – Balfour Beatty / Vinci / BeMo; LFM JV – Laing O’Rourke / FCC Construccion / Murphy; SCS JV – Skanska / Costain / Strabag £800m-£1.3bn
Civils: Chiltern Tunnels to Brackley ITT Live Jul 2017 Align JV – Bouygues  TP/ VolkerFitzpatrick / Sir Robert McAlpine; BBV JV – Balfour Beatty / Vinci / BeMo; CEK JV – Carillion / Eiffage / Kier; Momentum Infrastructure – Dragados / Hochtief / Galliford Try £800m-£1.3bn
Civils: Brackley to Long Itchington Wood tunnel ITT Live Jul 2017 Align JV – Bouygues TP / VolkerFitzpatrick / Sir Robert McAlpine; ASL – Acciona / Sisk / Lagan Construction Group; CEK JV – Carillion / Eiffage / Kier; Momentum Infrastructure – Dragados / Hochtief / Galliford Try £600m-£900m
Civils: Long Itchington Wood Tunnel to Delta Junction and Birmingham Spur ITT Live Jul 2017 BBV JV – Balfour Beatty / Vinci / BeMo; Fusion JV – Morgan Sindall / Bam Nuttall / Ferrovial Agroman; LFM JV – Laing O’Rourke / FCC Construccion / Murphy; SCS JV – Skanska / Costain / Strabag £900m-£1.5bn
Civils: Delta Junction to West Coast Main Line  ITT Live Jul 2017 BBV JV – Balfour Beatty / Vinci / BeMo; Fusion JV - Morgan Sindall / Bam Nuttall / Ferrovial Agroman; LFM JV – Laing O’Rourke / FCC Construccion / Murphy; Momentum Infrastructure – Dragados / Hochtief / Galliford Try £800m-£1.3bn
Phase one: Civils Preliminary design framework  Framework awarded Jul 2012 Aecom; Arup; Atkins; Capita / Ineco; Jacobs; Mott MacDonald; WSP PB TBC
Phase two: Development partner  Awarded Feb 2016 CH2M £130m-£170m
Phase two: Professional Services contract  Awarded Q4 2016  Lot One: Mott MacDonald / WSP Parsons Brinckerhoff; Lot 2: Aecom / Capita / Ineco Lot 3: inc. environmental overview consultancy Arup  £280m-£350m
Phase one: Systems preliminary design  Framework awarded Q2 2012 Arup; Jacobs; Mott MacDonald; WSP PB TBC
Phase one: Environmental framework  Framework awarded Q2 2012 Arup; Atkins; ERM; Jacobs; WSP PB TBC
Phase one: Land Referencing Framework awarded Q2 2012 Millar Bryce; Mouchel; Mott MacDonald; Terraquest TBC
Phase two: Civil design and environmental services Awarded Q4 2015 Ove Arup  TBC
Phase two: Railway systems design services framework Awarded Q4 2015 WSP PB TBC
Phase two: Site access and land referencing  Awarded Q4 2015 Mouchel TBC
Demolition of Vezey wing of Euston’s National Temperance movement Awarded Q2 2016 Keltbray £2m
Phase one: Ground Investigation  Frameworks awarded Q1 2015 Bam Ritchies; Environmental Scientifics Group; Fugro Seacore; Soil engineering geoservices; Structural Soils; Allied exploration & Geotechnics; RPS; WYG Environment £50m-£100m
Phase one Stations: Euston, Old Oak Common, Birmingham Interchange and Curzon Street Initial draft procurement document  Market engagement to begin Q3 2016   TBC

 

FUTURE CONTRACTS
ContractStatus Award dateBidders/winnersValue
Phase one: Rail systems Initial draft procurement document  Early market engagement begins Q3   TBC
Rolling stock and depots PQQ - Q2 2017, ITT Q2 2018 Q4 2019   TBC
         
Procurement of TBM power connections - Group Two Initial draft procurement document  Q2 2018   £32.4m
Procurement of Non-Traction and Traction power connections Initial draft procurement document  Q4 2018   £135m
Power supply services  Initial draft procurement document  Q2 2019   Tbc
Highway Signage  Initial draft procurement document  Q1 2017   <£10m

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted.